Coastal Protection - Gorleston Promenade
Option 2
- Annual beach recharge from Great Yarmouth Beach
and refurbish existing seawall:
- Maintain the beach at a level sufficient to prevent waves breaking on the seawall and to provide
more anaerobic conditions for toe piles so as to reduce the rate of corrosion.
- Recharge the beach with sand extracted from the accreting beach at South Denes, Great Yarmouth.
- Open beach with high amenity value
- High capital expenditure (very large recharge quantities required)
- Disruption every 5 years due to beach material transported to Gorleston beach
- Beach material lost alongshore
|
|