Coastal Protection - Gorleston Promenade
Option 6
- Constructing a new in-situ concrete wave return wall in front of the
existing vertical face and casting an in-situ slab over the existing apron.
The structure toe will be stabilised by new steel sheet piles driven in
front of the existing ones and replacing and refurbishing the existing
rock toe protection.
- open beach with high amenity value
- High capital expenditure
- Beach material lost alongshore and offshore
- Large recharge quantities required
|
|